建房术语汇总 (Glossary Of Terms)- 字母 A 打头的术语汇编

2014年06月26日 悉尼建房顾问



建房过程里会遇到很多行业术语,这里简单汇总以下,由于内容较多,先出一期字母 A 打头的。


88b Instrument –Details showing any restrictions applicableto the block of land –

i.e.easement


Absorption Trench –Is atrench designed to hold the stormwater. Some Councils specify the requirementof an absorption trench and this will form part of your Hydraulic design.


Acid Sulphate Soils –This is the name given to soils which contain iron sulphides. Additional measures are required to ensure thestructural integrity of your home. The classification is 1,2, 3, 4 or 5.


Acoustic Requirements –Some Councils will require a report from an Acoustic Engineer to accompany your Development Application. Additional measures may be required to comply with an internalnoise level (L10) of 50DA(A) for busy urban areas.


ACTPLA(ACT) –Is an assessment which must be completed on your new dwelling to assess it’s energy and water efficiency.


Application Plans (AP) –Initialset of plans drawn to reflect the tender.


Articulation–The architectural requirement to alleviate flat faces (long straight walls).


Association Of Building Sustainability Assessors Report (ABSA) – Refers todetailed assessment of the sustainability of your new home. Some Councils require this as part of your Development Submission.


Australian Height DatumSurvey (AHD) – A more detailed survey where levels are calculated from the average of many tide gauges on the East Coast of Australia (sealevel).


Authority To Commence Construction (ACC) – Letter issued from the relevant lending authority confirming all documents have been signed and received, loan has been settled and construction may commence.


如果您喜欢本文请点击右上角“发送给朋友”“分享到朋友圈”或点击右上角“查看官方账号”进行关注。

如果您有任何疑问或希望预约面谈选地,建房或是土地,项目开发,请致电本文作者MichaelZhu 0430169899或发送邮件至[email protected]

本微信涉及信息,数据,个人观点等,均为本人日常工作所得所悟,也许夹杂了一些行业内所见所闻/业内故事,如有不足之处,敬请见谅。

若需转摘本文另做他用,请务必与本人联系洽谈。

收藏 已赞